Background, challenge, solution, result
Background
A construction contractor required accommodation and dining facilities for a workforce ramping up over a single quarter.
Challenge
A workforce size that doubled mid-programme, requiring the camp to scale without a second mobilisation.
Solution
Site Major accommodation with a kitchen and dining facility, phased so the second tranche followed the workforce curve.
Result
Both phases delivered on the contractor's programme, with the camp scaling from the initial intake to full occupation.