Background

A mining operator required workforce accommodation on a site with no existing building infrastructure and a constrained wet-season delivery window.

Challenge

Cross-border freight, a fixed rainy-season deadline, and no local construction capacity within economic reach of the site.

Solution

Site Major accommodation blocks with associated ablution and laundry facilities, manufactured and consolidated for road freight into country.

Result

Handed over inside the dry-season window, with the camp occupied ahead of the operator's mobilisation date.