Mozambique
Accommodation Camp
1 240m² 2019
Background, challenge, solution, result
Background
A mining operator required workforce accommodation on a site with no existing building infrastructure and a constrained wet-season delivery window.
Challenge
Cross-border freight, a fixed rainy-season deadline, and no local construction capacity within economic reach of the site.
Solution
Site Major accommodation blocks with associated ablution and laundry facilities, manufactured and consolidated for road freight into country.
Result
Handed over inside the dry-season window, with the camp occupied ahead of the operator's mobilisation date.